JLG 1350SJP Service Manual User Manual

Page 271

Advertising
background image

SECTION 4 - BOOM & PLATFORM

3121142

– JLG Lift –

4-37

34.

Apply JLG Threadlocker P/N 0100019 to the bolts and
attach the cable guide to the inner mid boom section
with the mounting hardware. Torque the bolts to 165
ft.lbs. (224 Nm).

35.

Push the cylinder the rest of the way into the inner mid
boom assembly.

36.

Install the cylinder trunnion blocks and shims.

37.

Using Super Lube®, lubricate all wear surfaces on the
inside of the boom base section and the outside of the
inner mid boom section.

38.

Insert the inner mid boom section part way into the
boom base section enough to be able to pull the outer
mid retract cables out through the hole at the bottom
front of the boom base section.

39.

Apply JLG Threadlocker P/N 0100011 to the bolts and
install the front lower wear pads into the boom base
section. Torque the bolts to 50 ft.lbs. (68 Nm).

40.

Push the inner mid boom assembly the rest of the way
into the boom base section, adjusting the lifting device
as necessary to keep the weight balanced.

Advertising
This manual is related to the following products: