Scheduling a report – Rockwell Automation D64046.5.1 U MNL WIN DDMC User Manual

Page 142

Advertising
background image

Chapter 10
Using the Report Generator Software

10-10

You can schedule a report by selecting Schedule from the Report
Generation main menu. Using the Scheduler you can set dates and times
for the generation of a specific report type. You can also view the
scheduled reports you have previously set up through the Command
Scheduler interface. Selecting the login will allow you to specify the
account the report will be associated with.

When you choose Add from the Schedule menu, the Open screen appears,
with all the available report types listed for you to choose from.

Open screen

Once you select a report type, the DDMC32 Command Scheduler appears,
with its associated Add Command screen displayed.

DDMC Command Scheduler

Scheduling a Report

Advertising