YSI 6000UPG User Manual

Page 133

Advertising
background image

9-5

(ISE1), ORP (ISE2), and Depth (in this order). The DO warm-up time is set to 40 seconds.
Finally, the 6000

UPG

SDI-12 address is set to 1.

Master: 1V!

6000

UPG

: 10045[CR][LF]

The bus master initiates a verifying sequence. The 6000

UPG

responds that it will take a maximum

of 4 seconds to perform this command and, upon completion, it will have 5 data available.
... (after about 3 seconds)...

6000

UPG

: 1[CR][LF]

Master: 1D0!

6000

UPG

: 1+071592+094515+10.5+183+0[CR][LF]

When the 6000

UPG

finished the verifying sequence, it sent a service request to the bus master. The

bus master proceeded to retrieve the data with a "D0" command. The returned data showed that the
6000

UPG

real time clock read July 15, 1992 at 9:45:15. The battery voltage is 10.5 volts. The free

disk space is 183 KB. And there was no error.

Master:

1I!

6000

UPG

:

110YSIIWQSGEM600010012349ABCD[CR][LF]

The bus master asked for identification and the 6000

UPG

returned data showing the following.

SDI-12 level:

1.0

Manufacturer:

YSIIWQSG

Model:

EM6000

Version:

1.00

Sensor output: Date, Time, Temperature, Specific conductance, DO %, DO mg/L,

ISE1, ISE2, Depth

Master:

1M!

6000

UPG

:

10489[CR][LF]

The bus master sent a measurement command. The 6000

UPG

will take a maximum of 48 seconds to

finish the measurement. Upon completion, it will have 9 sensor data available.
...(after about 46 seconds)...

6000

UPG

:

a[CR][LF]

Master:

1D0!

Advertising