Installation, Smart trac ac1 installation – Yaskawa SmartTrac AC1 User Manual
Page 21
Advertising
SMART TRAC AC1
Technical Manual TM 3554-000 Smart Trac AC1 Installation
••
4-1
Smart Trac AC1 Installation
This Chapter will enable you to:
q
Prepare your Smart Trac AC1 for installation
q
Determine a physical location for your Smart Trac AC1.
q
Make required electrical connections.
q
Recommend the proper grounding and shielding for your
Smart Trac AC1.
q
Run adequate conduit for the wiring to and from your
Smart Trac AC1.
q
Audit your Smart Trac AC1 system using the Pre-power
checklist.
q
Become familiar with the Digital Operator
q
Start your Smart Trac AC1 for the first time.
q
Connect one or more vector-controlled motors.
q
Perform an integrated Smart Trac AC1 and motor test.
Advertising