Battery bank preparation, Important, Prepare the battery bank as follows – Xantrex Technology SW Plus 4024 User Manual

Page 86: Determine the type of batteries to be used, Battery bank preparation –4

Advertising
background image

Installation

3–4

976-0043-01-02

Remote monitors:

❐ ICM/25 (Inverter Control Module with 25 foot cable connection)

❐ ICM/50 (Inverter Control Module with 50 foot cable connection)

❐ ICA (Inverter Communications Adapter with 50 foot cable), for use

with your computer. (Can be used with a modem on site. A modem is
required for distances greater than 50 feet.)

Other accessories which might be required:

❐ Generator Start Module (GSM)

❐ Auxiliary Load Module (ALM)

❐ C-Series Charge Controllers (C35, C40, C60)

❐ TM500A Battery Status Meter

❐ ISC-S Cable

Battery Bank Preparation

Be sure to have read the section titled

“Battery Considerations” on

page 2–11

in the previous chapter before starting this procedure. For more

information, see

Appendix C, “Battery Information”

.

Prepare the battery bank as follows:

1.

Determine the type of batteries to be used.

See

“Battery Types” on page C–2

in

Appendix C

for information on

types of batteries and their applications.

2.

Determine the appropriate battery bank size and battery
configuration.

See

“Battery Requirements for Dual Inverter Systems” on page 2–15

for information on stacked (dual) inverter systems.

See

“Battery Bank Sizing” on page C–4

for additional information on

calculating battery bank size and

“Battery Configurations” on

page C–9

for information about how to wire the selected battery

configuration.

Important:

The inverter is not reverse polarity protected. Reversing the battery

polarity on the DC input connections will cause permanent damage to the inverter
which is not covered under warranty. Always check polarity BEFORE making
connections to the inverter

Advertising
This manual is related to the following products: