IAI America IA-101-X-USBMW User Manual

Page 151

Advertising
background image

10. Coordinate System Definition Data Edit W

indow

143

[2] When performing PTP positioning to position No. 5 and No. 6 in work coordinate system No. 2.

Fig. 10.6 Position Data Screen: Work Coordinate System No. 2 Setting

Sample program

:

:

:

SLWK 2 Select work coordinate system No. 2.

SLTL 0 Select tool coordinate system No. 0.

PTPR Specify right arm as the PTP target arm.

MOVP 5 Move to position No. 5.

MOVP 6 Move to position No. 6.

:

:

:

The R-axis position is shown at left (top view).

The Z-axis position is as follows:

Position No. 5 Zb = 25

Position No. 6 Zb = 45

Advertising
This manual is related to the following products: