IAI America IA-101-X-USBMW User Manual

Page 155

Advertising
background image

10. Coordinate System Definition Data Edit W

indow

147

[2] When performing PTP positioning of the tool end in tool coordinate system No. 1 to position No. 5

and No. 6 in work coordinate system No. 2:

Fig. 10.12 Tool Coordinate System Offset

Setting Screen

Fig. 10.13 Work Coordinate System Offset

Setting Screen

Fig. 10.14 Position Data Screen:

Work Coordinate System No. 2 and Tool Coordinate System No. 1 Setting

Sample program

:

:

:

SLWK 2 Select work coordinate system No. 2.

SLTL 1 Select tool coordinate system No. 1.

PTPR

Specify right arm as the PTP target arm.

MOVP 5 Move to position No. 5.

MOVP 6 Move to position No. 6.

:

:

:

The Z-axis position at the tool end is as follows:

Position No. 5 Zb = 25

Position No. 6 Zb = 45

Advertising
This manual is related to the following products: