1 introduction 2-3, 2 initial inspection 2-3, Initial inspection, 2-3 – Anritsu 681XXC User Manual

Page 22: Chapter 2 installation, Introduction -3, Initial inspection -3

Advertising
background image

Chapter 2
Installation

2-1

INTRODUCTION

This chapter provides installation instructions for the Series 681XXC
Synthesized Signal Generator. It includes information on initial in-
spection, preparation for use, storage, and reshipment, and General
Purpose Interface Bus (GPIB) setup and interconnections.

2-2

INITIAL INSPECTION

Inspect the shipping container for damage. If the shipping container or
cushioning material is damaged, retain until the contents of the ship-
ment have been checked against the packing list and the signal gen-
erator has been checked for mechanical and electrical operation.

If the shipment is incomplete or if the signal generator is damaged
mechanically or electrically, notify your local sales representative or
Anritsu Customer Service. If either the shipping container is damaged
or the cushioning material shows signs of stress, notify the carrier as
well as Anritsu. Keep the shipping materials for the carrier’s inspec-
tion.

681XXC OM

2-3

Use two or more people to lift and move this equipment, or
use an equipment cart. There is a risk of back injury, if this
equipment is lifted by one person.

WARNING

Advertising