Step 10

Place the right side inner slide assembly
onto the instrument case with the handle
towards the front of the instrument.

Step 11

Insert two green-headed screws through
the holes in the slide assembly behind the
handle and into the metric tapped holes
in the side of the instrument.

Step 12

Insert two green-headed screws through
the holes near the rear of the slide assem-
bly and into the metric tapped holes in
the side of the instrument.

Step 13

Insert the two SAE threaded screws (re-
moved from the feet) through the 90

° tabs

on the rear of the slide assembly and into
the rear panel of the instrument.

Step 14

Using the Phillips screwdriver, tighten all
screws holding the right side slide assem-
bly to the instrument chassis.

Step 15

With the appropriate hardware, install
the outer slide assemblies onto the equip-
ment rack.

Step 16

Lift the signal generator into position.
Align the inner and outer slide assem-
blies and slide the instrument into the
rack. Realign the hardware as needed for
smooth operation.

2-12

681XXC OM

RACK MOUNTING KIT

INSTALLATION

INSTALLATION

Use two or more people to lift and move this equipment, or
use an equipment cart. There is a risk of back injury, if this
equipment is lifted by one person.

WARNING