Standby operation 2-5, Standby operation, 2-5, Standby operation -5 – Anritsu 681XXC User Manual

Page 24: Preparation installation for use

Advertising
background image

Standby
Operation

Whenever the signal generator is not being used it
should be left connected to the power source and
placed in standby. This keeps the internal timebase
frequency reference at operating temperature.

On the front panel, press

LINE

to switch the

681XXC from

OPERATE

(green LED on) to

STANDBY

(orange LED on).

NOTE

During standby operation, the fan runs
continuously.

681XXC OM

2-5

PREPARATION

INSTALLATION

FOR USE

LINE

OPERATE

STANDBY

SYSTEM

MODULATION

LEVEL

CONTROL

Line

Key

Line Voltage
Selector Switch

Line
Fuse

GPIB

Connector

Figure 2-1.

Signal Generator Rear Panel showing Power Connection

Advertising