HT instruments SIRIUS89N User Manual

Page 111

Advertising
background image

SIRIUS89N

EN - 109

Procedure for insulation resistance measurement referred to the previous picture:

Switch situation

Point under test

Measurement result

Judgement on the
installation

Se R

≥ R

LIMITE

OK (end of the test)

1

Turn the switch A,

l D and E off

Effect the

measurement on switch

A

Se R

< R

LIMITE

Proceed

2

Se R

≥ R

LIMITE

Proceed

3

2

Turn the switch B

off

Effect the

measurement on switch

A

Se R

< R

LIMITE

INSTALLATION

NOT COMPLYING
WITH STANDARDS

Se R

≥ R

LIMITE

OK (end of the test)

3

Effect the

measurement on switch

B

Se R

< R

LIMITE

Proceed

4

Se R

≥ R

LIMITE

Proceed

5

4

Turn the switch C

off

Effect the

measurement on switch

B

Se R

< R

LIMITE

INSTALLATION

NOT COMPLYING
WITH STANDARDS

Se R

≥ R

LIMITE

OK (end of the test)

5

Effect the

measurement on switch

C

Se R

< R

LIMITE

INSTALLATION

NOT COMPLYING
WITH STANDARDS

Table5:

Table with procedure steps for insulation measurement referred to the

installation reported in Insulation measurements on an installation.

Note The switches D and E are those installed near the load having the purpose of
separating it from the installation. In case the above said RCDs do not exist it is
necessary to disconnect the users from the installation before effecting the insulation
resistance test.

ATTENTION:
If the installation includes electronic devices, disconnect them from the installation and
in case this is impossible only the test "a" is to be effected, that is to say between active
conductors (which in this case SHALL be connected together) and the earth.

Advertising