HT instruments SIRIUS89N User Manual

Page 29

Advertising
background image

SIRIUS89N

EN - 27

6.3.2. Measurement procedure

1. Select the desired test parameter by means of the

F1, F2, F3, F4 key.


2. Connect the Black, Green and Blue connectors of the three-terminal shuko cable or

of the split cables to the corresponding input terminals of the instrument

B1, B3, B4


Instrument connection for 230V single-phase

RCD check

Instrument connection for 400V + N + PE three-

phase RCD check

Instrument connection for 400V + N (no PE) three-

phase RCD check

Instrument connection for 400V + PE (no N)

three-phase RCD check

3. Connect the shuko plug or the Test leads to the System under test according

with one of the picture above.



Advertising