Configuration, Mounting, Wiring – Det-Tronics EQP Fire and Gas Detection/Releasing System User Manual

Page 42

Advertising
background image

3-23

14.1

95-8533

CONFIGURATION

S3 Configuration
The S3 configuration software is used to configure the

redundant controllers. A check box on the controller

configuration screen must be enabled and

downloaded to the controllers.

IMPORTANT

If the controllers have not been configured for
redundancy via the S3 configuration software,
redundancy will not function.

Controller Addresses
The LON addresses are pre-determined and cannot

be adjusted. Address 1 and 2 have been reserved for

a redundant controller configuration.

Modbus
Modbus ports on each controller share the serial

settings including baud rate and address. Controllers

in standby mode don’t respond to or issue Modbus

messages. This allows for transparent switching on a

multi-drop network. If RS-232 is used, a relay

switching mechanism can be used.

ControlNet
The ControlNet interface on each controller will have

different addresses. This allows both controllers to

reside on the same ControlNet network at the same

time. The primary controller uses the configured

address while the standby assumes an address 1

higher than the primary controller. Application logic in

the attached PLC must be used to determine which

controller has the correct output information.

Information coming from the PLC should be written to

both Premier Controllers.

EQ21XXPS SERIES POWER SUPPLY

AND POWER SUPPLY MONITOR

INSTALLATION

WARNING!

ALWAYS follow all safety notes and instructions
when installing power supply or batteries!

WARNING!

Make sure a.c. power is OFF at main a.c.
breaker before beginning power supply
installation!

IMPORTANT!

Power supplies require unrestricted air flow for
proper cooling.

MOUNTING
Mount the power supply monitor in a Nationally

Recognized Test Laboratory (NRTL) labeled

enclosure. Refer to the “Specifications” section for

mounting dimensions.

WIRING

CAUTION!

The power supply should be properly connected
to an earth ground! A ground wire MUST be
connected to the power supply units’s case
ground!

NOTE

The Power Supply Monitor uses two of the four
DIP switches to select an appropriate fault level
for the installation. See Figure 3-18. The unit will
fault when the batteries source a current level
higher than the threshold for 20 seconds. The
fault will clear when the current drops to half the
level for 20 seconds. The current level selection
is based on the minimum current draw of the
attached equipment. The selected value must be
less than the actual minimum current draw for
the system.

1. Verify that the input source is the same voltage

and frequency as that marked on the nameplate

of the power supply.

2. Verify that transformer taps are set for the correct

a.c. input. (Input tap setting is located inside the

power supply enclosure.)

3. Verify that the supply power wire size and fusing

are adequate for the current indicated on the

power supply nameplate.

NOTE

Consult the power supply manufacturer’s instruction
manual provided with the support documentation
received with the Eagle Quantum System.

NOTE

Required Overload Current is usually equal to
15% of the nominal rating.