Eq25xxarm series agent release module – Det-Tronics EQP Fire and Gas Detection/Releasing System User Manual

Page 72

Advertising
background image

3-53

14.1

95-8533

EQ25XXARM SERIES AGENT RELEASE MODULE

Mounting
The device should be securely mounted to a vibration

free surface. (See “Specifications” in this manual for

device dimensions.)

Wiring
To ensure proper operating voltage for the output

device, the maximum wiring length from power source

to device must not exceed the values shown in Table

3-19 for automatic release applications or Table 3-20

for deluge and pre-action applications.

NOTE

For solenoids, this wire length includes both the
wiring from power supply to device, and the
wiring from device to solenoid.

See Figure 3-67 for identification of wiring terminals.

Terminals 1 to 4 —

Output terminals

Connect a single solenoid

between terminals 1 and 4.

Connect dual solenoids

between terminals 1 and 2,

and between terminals 3 and

4.

NOTE

For testing purposes, a load resistor of 1200 to
1500 ohms @ 1 watt can be placed across
terminals 1 and 4.

CAUTION!

DO NOT intermix different types of initiators in
release circuit.

Terminals 5 to 10 —

LO N s i g n a l i n g c i rc u i t
terminals

NOTE

Be sure to observe polarity when wiring the
LON.

5 — “A” side of signaling

circuit for COM 2

6 — “B” side of signaling

circuit for COM 2

7 and 8 —

s h i e l d

connections

9 — “A” side of signaling

circuit for COM 1

10 — “B” side of signaling

circuit for COM 1

Terminals 11 to 14 — 24 vdc power input

Connect module power

supply to terminals 12 and

13.

NOTE

If an auxiliary output supply is used for powering
solenoids, it should be connected to terminals 11
and 14.

Table 3-19—Maximum Wiring Length for Automatic Release

Applications

*Fenwal Solenoid
**Ansul Solenoid

Device

Maximum Wire Length in Feet

12 AWG 14 AWG 16 AWG 18 AWG

890181*

150

100

60

895630*

150

100

60

897494*

190

120

75

570537**

3000

1900

1200

750

Advertising