5 test screen – Zhone Technologies IMACS-200 User Manual

Page 144

Advertising
background image

5-14

WAN Ports

Model No.

Running Head

WAN port User Screens and Settings

WAN ports

5.3.5

Test Screen

Pressing “t” (Test command) in the WAN port Main Screen brings up the screen shown in
Figure 5-10. From this screen, you can create test situations between WAN ports or between
a single WAN port and data test equipment at a remote site. Table 6-5 lists the actions you can
perform from the bottom line of this screen. Table 6-6 lists the settings controlled on this
screen along with their possible values.

Figure 5-10.Typical WAN port Test Screen

Table 5-5. Test Screen Actions

Table 5-6. WAN port Test Screen Options

Action

Function

Save

Saves changes to settings.

Undo

Returns all settings to the last saved state.

Refresh

Updates certain time-related information fields that are not automatically
updated (i.e., performance and test data).

Insert Err

Allows you to manually insert a single bit error into the data signal. This does
not cause a CRC error.

Clear

Clears the Test Screen and resets all counters to zero.

Main

Returns to the WAN port Main Screen. If changes are made to settings and not
saved, you will be prompted to save or abandon those changes.

Parameter

User Options

Notes

Default

BERT

off mark space 1:1 1:7 3:24 qrss
prb11 prb15 prb20

1

off

SYNC

information only–no user options

BE

information only–no user options

ES

information only–no user options

SES

information only–no user options

CSES

information only–no user options

Advertising