Chapter 1 quick start, 3 system connection s – INFICON SQC-310 Thin Film Deposition Controller User Manual
Page 10
Chapter 1
Quick Start
1-4
1.3 System Connection s
S e nsor
F ee d throu gh
In-V a c
C a ble
6" B N C C a ble
O scilla tor
S o urce
S h utter
G ro u nd W ire
E vap oration S up ply
O u tp ut C o ntrol Inp ut
B N C
C ab les
System Components
Sensor
Holds the quartz crystal used to measure rate and thickness.
Crystals must be replaced occasionally.
In-Vac Cable
A coaxial cable that connects the sensor to the feedthrough.
Feedthrough
Provides isolation between vacuum and atmosphere for
electrical and cooling lines.
6” BNC Cable
Provides a flexible connection from the feedthrough to the
oscillator. Keep this cable as short as possible.
Oscillator
Contains the electronics to operate the quartz crystal. Total
cable length to the crystal should be under 40”.
Sensor Input
BNC Cable
Connects the oscillator to the SQC-300 input. Lengths up to
100’ are acceptable.
Control Output
BNC Cable
Connects the SQC-300 output to the evaporation source’s
control voltage input. Keep the length below 10’.
Ground Wire
A wire, typically braided, that connects the vacuum system to
the SQC-300 ground terminal. Important for noise rejection.