B _ un ` a c, Motec with motor or geared motor – Lenze E82MV 8200 motec 0.55kW-2.2kW User Manual

Page 89

Advertising
background image

motec with motor or geared motor

Wiring according to EMC requirements

P

EDK82MV222 DE/EN/FR 9.0

UV

L

`зеЗбнбзел Сзк íêçìÄäÉJÑêÉÉ зйЙк~íáçåW

z

bñÅÉéí Сзк нЬЙ г~бел Е~ÄäÉI млЙ лЬбЙдЗЙЗ Е~ДдЙл çåäóK

z

qЬЙ лЬбЙдЗ гмлн ДЙ Е~кЙСмдду ЕзееЙЕнЙЗ нз mbK

z

`зееЙЕн гзнзк ~еЗ г~бел mb ЕзеЗмЕнзкл нз лЙй~к~нЙ mb нЙкгбе~длK

8200mot101

^

b

_

uN

`

a

c

Shield connection
1. Prepare cable

2. Route the cable

through the eyebolt

of the shield and

bend the eyebolt.

3. Tighten the screw.

The shield must be

tightly connected to

the shield sheet.

0.7 Nm

6 lb-in

PES

Mains cable L1, L2, L3, PE

PE connection - mains cable

Shielded control cable

Shield connection for control cable (screw shield to shield sheet)

Function module

Isolated terminal (e. g. star point for motor star connection)

X1

Terminal strip - mains connection

PES

HF shield connection by connecting the shield with a surface as large as possible to PE

Advertising