Chapter 5

Installation

5–6

To install the DTAM Plus Operator Module:

Disconnect all electrical power from the panel before
making cutout.

Make sure that area around panel cutout is clear.

Take precautions so that metal filings or other debris do not
fall into the DTAM Plus ventilation slots or enter any
components that may already be installed in panel.

Make sure that no objects are inserted or fall into the terminal
through the ventilation slots or DIP switch access hole.

Failure to follow these warnings may result in personal injury
or damage to the panel components.

ATTENTION:

!

1. Cut an opening in the panel as shown in Figure 5.3. Use the cutout

template located inside the back cover of this manual. Remove any sharp
edges or burrs.

2. Make sure the sealing gasket is properly positioned on the DTAM Plus

This gasket forms a compression type seal. Do not use sealing
compounds.

3. Place the DTAM Plus in the panel cutout.

Mounting nuts must be tightened to a torque of 8 to 10 inch
pounds to provide a proper seal and to prevent potential
damage to the terminal. Allen-Bradley assumes no
responsibility for water or chemical damage to the terminal or
other equipment within the panel enclosure because of
improper installation.

ATTENTION:

!

4. Install the six self locking mounting nuts hand tight.

5. Alternately tighten the mounting nuts until the DTAM Plus is held firmly

against the panel. Tighten mounting nuts to a torque of 8 to 10
inch-pounds. Do not over-tighten nuts.