Figure 3-10. Serial/Modem Settings Screen
3-5.5. UPS
This screen allows users to connect the SiteOmat to an UPS (Uninterruptable Power Supply)
system. In cases where a prolonged power interruption has occurred, the BSP properly shuts
down all applications and stops the FCC. When power is restored, the BSP restarts the system
automatically.
Currently, only one UPS vendor is supported: ARTronic 1KVA & 3KVA.
To set up the UPS, proceed as follows:
1. Click on the UPS navigation button. The OrCU UPS Setup screen appears (see
Figure 3-11)
2. Define the following parameters (described in Table 3-2) using the drop-down lists and
text boxes