Gasboy SiteOmat Maintenance Manual User Manual
Page 90

86
SiteOmat Setup and Maintenance Manual – MDE 4817G
Figure 4-25. Setup Pump Settings Dialog Box
2. Enter the actual Number of nozzles and click Save to save the changes and close the dialog
box
3. Configure each nozzle (hose) to the actual tank the nozzle is connected to
4. Define if the specific nozzle (hose) is Active. If the checkbox is unchecked, refuel process
from this nozzle isn't authorized
5. In cases where the Controller includes a Vehicle Identification System, enter its data transfer
channel. Each hose is linked to a specific F.P. Plus Channel to be selected from the
drop-down list.
6. Enter the cut off delay, which is the waiting time, in seconds, before stopping the pump
when no VIU is detected
7. For pumps that support Satellite linked nozzles, (two nozzles connected to the same pump
head allowing simultaneous refuel from both sides of a truck), select the F.P. Plus Channel
from the Satellite drop down list
8. Click on the Reload button, in order to finish the Setup process.