APPENDIX A: ARGON-HYDROGEN CUTTING AND GOUGING

a-6

HySpeed HT2000LHF

Instruction Manual

6

Turn Power Supply On and Adjust Voltage/Current

1. Turn the main disconnect switch ON. See

Status Indicators Before Startup

in

Section 4

.

2. Turn on the power supply by depressing the POWER ON (I) button (PB1) on the power supply. Ensure

that the green POWER ON indicator illuminates. Hold PB1 down until all of the status indicators

extinguish.

3. Set the voltage and current. Select the arc current and arc voltage settings from the

Argon-Hydrogen Cut

Charts

later in this section for the type and thickness of metal to cut.

PLASMA

N

2

/Air

O

2

SHIELD

N

2

/Air

psi

psi

psi

DC

N

2

/Air

O

2

O

2

PLASMA

Cut Flow

PreFlow

PreFlow

Run

10

9

8

7

6

5

4

3

2

1

0

10

9

8

7

6

5

4

3

2

1

0

Test

Preflow

Test

Cutflow

HySpeed

®

HT2000LHF

®

MV1

FM1

S2

PG3

Adjust Preflow Gases

1. Set S2 on the gas console to Test Preflow

.

Verify that the

argon-hydrogen supply regulator reads 120 psi (8.2 bar).

2. Look at the flowmeter (FM1) on the argon-hydrogen

manifold and set the Preflow plasma gas flow rate % by

referring to the

Argon-Hydrogen Cut Charts

and turning the

argon-hydrogen flowmeter adjust knob (MV1).

3. Look at the shield gas pressure gauge (PG3) on the gas

console, and set to the

Argon-Hydrogen Cut Chart

specifications by turning the shield gas adjust knob (MV4).

Note: If you have changed consumable parts or if the power

supply has been off for more than 1 hour, purge gas

lines by leaving the system in Test Preflow for 1

minute.

Adjust Cut Flow Gases and Prepare for Cutting

1. Set S2 on the gas console to Test Cut Flow

.

2. Look at the flowmeter (FM1) on the argon-hydrogen

manifold and set the Cut Flow plasma gas flow rate % by

referring to the

Argon-Hydrogen Cut Charts

and turning the

argon-hydrogen flowmeter adjust knob (MV1).

3. Set S2 to Run after the test preflow and test operate flow

rates have been set.

The system is now ready for operation.