Turn line disconnect

switch on

Push and hold

ON button (PB1)

Release ON button (PB1)

System initialization

is complete.

12VDC to the following interlocks:

1.

TSW1, TSW2

(Chopper temperature switches)

2.

TS1

(Power Supply transformer temperature switch)

3.

LS1

(Power Supply coolant level switch)

4.

PS3

(Power Supply shield pressure switches)

5.

PS1,

,

PS2

(Gas Console plasma pressure switches)

6.

TS2

(Power Supply coolant temperature switch)

7.

FS1

(Power Supply coolant flow switch – note this interlock

will not be satisfied until

M1

coolant pump is activated.)

CR1

(24V/120V relay) on Power Distribution

Board (PCB1) closes.

24VAC to

LT1

(Power Supply ON light)

PCB2

(Power Supply-

µ

P Control Board

24VAC interlock)

120VAC to

CH1

,

CH2

(Power Supply Choppers)

PCB3

(Power Supply Analog Board)

PCB4

(Power Supply Relay Board)

PCB9

(Power Supply THC Board)

CR2

(120V relay) on Power

Distribution Board (PCB1)

closes.

120VAC to

M2

,

M3

,

M4

(Power Supply

Fans)

M5-M8

(Power Supply Heat

Exchange Fans)

PCB2

(Power Supply-

µ

P

Control Board)

CR3

(240V relay) on Power

Distribution Board (PCB1)

closes.

240VAC to

M1

(Power Supply Coolant

Pump)

All STATUS LEDs on

PCB5

(Interlock Display

Board) are extinguished.

Correct

Interlock

Problem

Correct

Interlock

Problem

First 5 interlocks

listed above

satisfied

?

All interlocks

listed above

satisfied

?

No

No

Yes

Yes

MAINTENANCE

HySpeed HT2000LHF

Instruction Manual

5-3

6

Gas Console

Inspection

Inspect the gas console on a routine basis.

• Check the exterior for any damage. Look for damaged glass tubes in the flowmeters and check the

pressure gauges for damage.

• Inspect all interconnecting cables, hoses and leads for wear and damage. Ensure that all connections are

tight and that there are no leaks. Do not overtighten fittings.

Cleaning

Keep the flowmeters and pressure gauges free of dirt, dust and foreign matter.

Start Sequence

Shaded boxes represent

action taken by the operator.

Advertising
This manual is related to the following products: