On/off hook test, On/off hook test -4 – Verilink 8100A (34-00237) Product Manual User Manual

Page 242

Advertising
background image

7-4

8 0 0 0 S e r i e s

top ringing all lines...
Line 1 2 3 4 5 6 7 8
Ring test complete

4

Press any key to terminate the test. The IAD displays the POTS Diagnostics
menu.

5

Continue with other tests, or press Escape twice to return to the Main menu.

On/Off Hook Test

The On/Off Hook test reports the hook state of each voice port line. To
perform an On/Off Hook test, follow the steps below.

1

Type “O” on the POTS Diagnostics menu to select On/Off Hook Test. The
IAD displays the status of the test as it runs in real time:

2

Press Enter to terminate the test. The IAD displays the POTS Diagnostics
menu.

The other tests listed on the POTS Diagnostics menu (Figure 7.3) are reserved
for Verilink engineers:

I. Infineon Codec Test

C. Select Voice Loop Back Test Channel (8208 Only)

V. Send/Receive Voice

M. Quick Voice Loop Back Test (8208 Only)

N. Burning Voice Loop Back Test (8208 Only)

T. Test External DSP Memory

Advertising