7.3 Setting Power Frequency Monitoring

You can specify the thresholds and tripping time manually. For frequency monitoring, three limits can be configured for

both overfrequency and underfrequency.
For example, at an overfrequency of 50.5 Hz, tripping can take place after one second, or at an overfrequency of

51.5 Hz, after 0.1 seconds.

Figure 17: Tripping characteristics and temporal behavior as exemplified by frequency monitoring

Procedure:

1. Log into the user interface.
2. Change parameters for grid monitoring (see Section 6.2, page 40).
3. Confirm the parameter entry with [Save].

7.4 Grid Connection after Elimination of Error

If a grid fault has been eliminated on the Sunny Central, it will only switch back on once the line voltage has met certain

conditions. The line voltage and the power frequency must remain within the set thresholds for grid connection for the

duration of the grid monitoring period. Until the grid connection conditions are met, the error message 1500 - Grid

reconnection fault appears in the touch display.
You can prevent automatic reconnection of the Sunny Central by setting the parameters (see Section 7.7 "Activating the

Manual Resume Mode", page 48). The Sunny Central will not switch back on until the error has been acknowledged.

7.5 Setting the Active Power Ramp-Up

1. Log into the user interface.
2. Set the parameter WGra to the required value (see Section 6.2, page 40).
3. Confirm the parameter entry with [Save].

Contact the SMA Service Line before changing any parameters.