10.4.4 Error Number 34xx to 40xx - Disturbance on PV Array

0801

One line conductor of the utility grid

has failed.

30 s

30 s

• Check line voltage.
• Make sure the external fuses

function properly.

• Make sure the AC cable

connections are securely

connected.

0802*

1301

Left rotating magnetic field is

connected.

30 s

Q

• Check phase angle.
• Make sure all fuses are

switched on.

1500

The conditions for grid reconnection

have not yet been reached after a

grid error.

W

W

• Check power frequency and

line voltage.

* Depending on the parameterization, the error message may have to be acknowledged manually.

Error no.

Explanation

Behavior of the

Sunny Central

Corrective measures

S 1

S 2

R

3403

Voltage of PV array is too high.

15 min 30 min

• Check DC input voltage.
• Check module wiring and

PV system design.

3404

Open-circuit voltage is too high.

Disturbance detected through

standard monitoring.

15 min 30 min

3406

DC voltage is too high.

15 min 30 min

3501

Insulation monitoring device has

measured insufficient grounding

resistance.
With the options "GFDI and

insulation monitoring device" and

"Remote GFDI and insulation

monitoring device", the insulation

monitoring device is only active

when the GFDI and the Remote

GFDI, respectively, are open.

C

C

• Check PV array for ground

faults.

3502

The GFDI has tripped.

C

C

Error no.

Explanation

Behavior of the

Sunny Central

Corrective measures

S 1

S 2

R