4 combined insulation and ground-fault monitoring, 1 gfdi and insulation monitoring device, 2 remote gfdi and insulation monitoring device – SMA SC 500CP-10-JP User Manual

Page 26

Advertising
background image

3  Product Description

SMA Solar Technology AG

26

SCCP-JP-BA-A4-en-12

User Manual

Type of insulation monitoring device used
The insulation monitoring device used is the A-ISOMETER iso-PV1685 device supplied by Bender GmbH & Co. KG.

3.7.4 Combined Insulation and Ground-Fault Monitoring

3.7.4.1 GFDI and Insulation Monitoring Device

With the order option "GFDI and Insulation Monitoring", it is possible to temporarily disable the PV array grounding and

to check the insulation via the integrated insulation monitoring device.
When the GFDI is closed, the PV array is grounded. In this state, the insulation resistance cannot be determined.
When the GFDI is open, grounding is disabled. In this state, the insulation monitoring device continuously measures the

insulation resistance. In the operating state "MPP load operation", the insulation resistance of the entire system, from the

PV array to the MV transformer, will be measured. If the Sunny Central is in the operating state "Grid monitoring", only

the insulation resistance from the PV array to the Sunny Central will be measured.
Insulation monitoring should be performed in the operating state "MPP load operation" so that all sections of the

PV system are included in the insulation measurement.

Insulation Monitoring

The insulation monitoring device will start measuring once the GFDI is open. The insulation monitoring device will initially

assume that the insulation is poor. If the parameter IsoErrIgn is set to Off, the Sunny Central will switch off temporarily.
The insulation monitoring device takes approximately five minutes to detect the correct insulation resistance. The value of

the insulation resistance can be read off from the user interface in the instantaneous value Riso. If the insulation is intact,

the Sunny Central switches back to the operating state "MPP load operation." Once the insulation monitoring process is

complete, the GFDI should be closed again, thus enabling the PV array to revert to grounded operation.
If after approximately five minutes one of the errors 3501 ‒ Insulation error, 3504 ‒ Insulation error ignored,

or 3601 ‒ Warning insulation error is displayed, the insulation is defective. In this case, a qualified person will need

to check and, if necessary, repair the insulation and then acknowledge the error.

Type of insulation monitoring device used
The insulation monitoring device used is the A-ISOMETER iso-PV1685 device supplied by Bender GmbH & Co. KG.

3.7.4.2 Remote GFDI and Insulation Monitoring Device

With the order option "Remote GFDI and Insulation Monitoring", it is possible to automatically correct errors which have

occurred, to temporarily disable the grounding connection of the PV array and to check the insulation with the integrated

insulation monitoring device.
When the Remote GFDI is closed, the PV array is grounded. In this state, the insulation resistance cannot be determined.

If the Remote GFDI triggers, initially a temporary error will be assumed and a motor drive will close the Remote GFDI

after a defined delay. No external switch command is required to close the triggered Remote GFDI. The Sunny Central

will switch back to feed-in operation after a defined delay.
In the default setting of the Sunny Central, the software will attempt to start the Remote GFDI up to three times per day.
If the Remote GFDI triggers on several consecutive days, the software will assume that a permanent insulation error has

occurred, and the Sunny Central will no longer revert to operation. In this case, a qualified person will need to check and,

if necessary, repair the insulation and then acknowledge the error.
When the Remote GFDI is open, the grounding connection is disabled. In this state, the insulation monitoring device

continuously measures the insulation resistance. In the operating state "MPP load operation", the insulation resistance of

the entire system, from the PV array to the MV transformer, will be measured. If the Sunny Central is in the operating state

"Grid monitoring", only the insulation resistance from the PV array to the Sunny Central will be measured.
Insulation monitoring should be performed in the operating state "MPP load operation" so that all sections of the

PV system are included in the insulation measurement.

Advertising