9  Setting the Insulation Monitoring of the PV System

SMA Solar Technology AG

74

SCCP-JP-BA-A4-en-12

User Manual

9.3 Setting the PV System to Insulation Monitoring with Remote Soft

Grounding and an Insulation Monitoring Device

9.3.1 Information on Insulating PV Modules with Remote Soft Grounding and an

Insulation Monitoring Device

Ground-fault monitoring with Remote Soft Grounding does not provide protection from injury.
The option "Remote Soft Grounding and insulation monitoring device" allows the PV array to be switched automatically

from grounded operation to insulated operation. To ensure that there is no insulation error on the grounded terminal, an

insulation measurement is carried out. After switching to insulated operation, the insulation monitoring device checks each

terminal of the PV array for potential insulation errors.
Switching to insulated operation is useful for performing maintenance or service work on or near the PV array (e.g. cutting

the grass) or for checking the status of the insulation at regular intervals.

9.3.2 Switching to Insulated Operation

1. Set the parameter RemMntSvc to On (see Section 6.2, page 40).

☑ The insulation monitoring device starts collecting data. When the parameter IsoErrIgn is set to On, the error

3504 - Insulation error ignored is displayed.

✖ The displayed error 3504 does not disappear after approximately 15 minutes?

The insulation is defective.

• Have the insulation checked and, if necessary, repaired by a qualified person.
• Acknowledge the error.

2. Wait a few minutes and then display the instantaneous value Riso on the user interface (see Section 6.1, page 40).

☑ The insulation resistance is greater than 45 k Ω . It is safe to enter the PV system.

✖ The insulation resistance is less than 45 k Ω ?

There is an insulation error and you must not enter the PV system.

• Have the insulation checked and, if necessary, repaired by a qualified person.

9.3.3 Switching to Grounded Operation

• Set the parameter RemMntSvc to Off (see Section 6.2, page 40).