Demonstration, Operation manual, Running the program – ACU-RITE MILLPWR 2 Axes User Manual

Page 88

Advertising
background image

DEMONSTRATION

MILLPWR

®

Operation Manual

4-19

Running the Program

The first step in running a new program is to establish datum.
Remember that to chose the center of the bolt circle as datum.

Place the workpiece into a vise.

Position the tool over the workpiece where you
want the center of the bolt circle’s datum to be.

From the DRO screen, press the

DATUM

softkey.

Press the

X = 0

and

Y = 0

softkeys to establish the

current tool position as datum, and then press the

USE

key.

Return to the program by pressing the

PGM

key.

Perform a second dry run, this time allowing the table to move
to see if we have correctly set Zero.

Press

RUN OPTIONS

then press

DRY RUN

.

Check that

GRAPHICS ONLY

is not selected.

• Now press the

GO

key and check that the tool is

clear of any obstruction.

• Press the

GO

key again.

MILLPWR

will run each

step without stopping.

If the cursor
is positioned
past the last
step,
MILLPWR
will automati-
cally go to step
001 when you
press GO.

Advertising