Decommissioning an e-port, Decommissioning all ports on a switch, Recommissioning an e-port – Brocade Network Advisor SAN User Manual v12.1.0 User Manual

Page 459

Advertising
background image

Brocade Network Advisor SAN User Manual

409

53-1002948-01

Port commissioning overview

12

Decommissioning an E-Port

NOTE

You must enable Lossless DLS on both the source and destination switches before you
decommission an E-Port.

NOTE

Fabric tracking must be enabled (refer to

“Enabling fabric tracking”

on page 131) to maintain the

decommissioned port details (such as port type, device port wwn, and so on). Do not accept
changes in the Management application client.

Select the E-Port in the Product List, then select Configure > Port Commissioning > Decommission
> Port.

While decommissioning is in progress, a down arrow icon displays next to the port icon in the
Product List. You can view the port commissioning results in the deployment reports (refer to

“Port

commissioning deployment report”

on page 412).

When the decommission is complete, an application event displays in the Master Log detailing
success or failure.

Recommissioning an E-Port

NOTE

You do not need to enable Lossless DLS before you recommission an E-Port.

Select the E-Port in the Product List, then select Configure > Port Commissioning > Recommission
> Port.

While recommissioning is in progress, an up arrow icon displays next to the port icon in the Product
List. You can view the port commissioning results in the deployment reports (refer to

“Generating a

deployment report”

on page 946).

When the recommission is complete, an application event displays in the Master Log detailing
success or failure.

Decommissioning all ports on a switch

NOTE

Fabric tracking must be enabled (refer to

“Enabling fabric tracking”

on page 131) to maintain the

decommissioned port details (such as port type, device port wwn, and so on). Do not accept
changes in the Management application client.

1. Select the switch or logical switch for which you want to decommission all ports, then select

Configure > Port Commissioning > Decommission > All F-Ports on the Switch.

NOTE

You can only decommission ports from the logical switch, not the physical chassis.

The Port Commission Confirmation dialog box displays.

Advertising