6 tilt valve, Tilt valve – JLG G12-55A AccuPlace Service Manual User Manual

Page 108

Advertising
background image

Hydraulic System

8.18

G10-55A & G12-55A AccuPlace

8. If necessary, remove the telescope valve controller

from the telescope valve.

b. Telescope Valve Installation

1. If necessary, install the telescope valve controller to

the telescope valve with the previously used
hardware. Refer to Section 8.8.11, “Valve
Controllers,”
for proper torque values and sequence.

2. Install the telescope valve to the extend cylinder with

the previously used hardware.

3. Connect the previously labeled electrical connectors

to the telescope valve.

4. Uncap and connect the previously labeled hydraulic

hoses to their appropriate locations.

5. Connect the battery negative (-) cable to the battery

negative (-) terminal.

6. Before starting the machine, check fluid level of the

hydraulic fluid reservoir and if necessary fill to full
mark with Mobilfluid 424

®

(ISO 46).

7. Start the machine and run at low idle for about one

minute. Test the functions of the telescope valve.

8. Inspect for leaks and check level of hydraulic fluid in

reservoir. Add hydraulic fluid if needed. Shut the
engine OFF.

9. Close and secure the engine cover.

8.8.6

Tilt Valve

a. Tilt Valve Removal

1. Park the machine on a firm, level surface, level the

machine, fully retract the boom, lower the boom,
place the transmission control lever in (N) NEUTRAL,
engage the park brake and shut the engine OFF.

2. Place a Do Not Operate Tag on both the ignition key

switch and the steering wheel, stating that the
machine should not be operated.

3. Open the engine cover. Allow the system fluids to

cool.

4. Disconnect the battery negative (-) cable from the

battery negative (-) terminal.

5. Remove the protective cover from the boomhead.

6. Thoroughly clean the valve and surrounding area,

including all hoses and fittings before proceeding.

7. Label, disconnect and cap the hydraulic hoses

attached to the tilt cylinder (11). Cap all fittings to
prevent dirt & debris from entering the hydraulic
system.

8. Label and disconnect the electrical connectors from

the tilt valve (12).

9. Attach a suitable sling to an appropriate lifting device

and to the tilt cylinder. Make sure the device used is
capable of supporting the cylinder.

10. Remove the lock bolt and/or any retaining clips

securing the cylinder pins. Remove the cylinder pins.

11. Lower the cylinder from the boom.

12. Remove the hardware securing the Tilt valve to the

tilt cylinder. Remove the tilt valve.

13. If necessary, remove the tilt valve controller from the

tilt valve.

b. Tilt Valve Installation

1. If necessary, install the tilt controller to the tilt valve

with the previously used hardware. Refer to Section
8.8.11, “Valve Controllers,”
for proper torque values
and sequence.

2. Install the tilt valve to the tilt cylinder with the

previously used hardware.

3. Grease the bushings at the ends of the tilt cylinder.

Using an appropriate sling, lift the cylinder into it’s
mounting position.

4. Align the cylinder bushing and install pin and

retaining clips.

MAP0260

12

11

Advertising
This manual is related to the following products: