Hydraulic System

8.22

G10-55A & G12-55A AccuPlace

8.8.11

Valve Controllers

Valve controllers (7) are located on the following valves:
Lift Valve, ISP Valve, Telescope Valve and Tilt Valve.

When installing the valve controller onto the valve, ensure
transducer gaskets are in place and torque the bolts to 4
lb-ft (5 Nm) in the following sequence:

8.9

HYDRAULIC PISTON
ACCUMULATOR

8.9.1

Accumulator Removal

1. Park the machine on a firm, level surface, level the

machine, fully retract the boom, raise and support the
boom, place the transmission control lever in (N)
NEUTRAL, engage the park brake and shut the
engine OFF.

2. Place a Do Not Operate Tag on both the ignition key

switch and the steering wheel, stating that the
machine should not be operated.

3. Open the engine cover. Allow the system fluids to

cool.

4. Disconnect the battery negative (-) cable from the

battery negative (-) terminal.

5. Thoroughly clean the accumulator and surrounding

area, including all hoses and fittings before
proceeding.

6. Discharge the pressure in the accumulator.

Note: Attaching the charging assembly to the gas valve
on the accumulator will relieve any residual pressure in
the accumulator. Refer to Section 8.9.2, “Accumulator
Pre-Charge & Check Procedure.”

7. Place a suitable container under the hydraulic hose

fittings on the accumulator and lift manifold to catch
hydraulic oil.

8. Label, disconnect and cap the hydraulic hose

attached to the accumulator (1) and lift manifold (2).
Cap all fittings to prevent dirt & debris from entering
the hydraulic system.

9. Label and disconnect the electrical connectors from

the accumulator.

10. Remove the hardware securing the accumulator to

the bracket. Attach a suitable sling to the
accumulator. Remove the accumulator from the
machine.

Note: Accumulator weighs approximately
128 lbs (58 kg).

e. Accumulator Installation

Note: New accumulators are precharged.

1. Install the accumulator to the bracket with the

previously used hardware.

2. If necessary, charge the accumulator. Refer to

Section 8.9.2, “Accumulator Pre-Charge & Check
Procedure.”

3. Uncap and connect the previously labeled hydraulic

hose to the appropriate locations on the accumulator
and lift manifold.

4. Connect the previously labeled electrical connectors

to the accumulator.

5. Connect the battery negative (-) cable to the battery

negative (-) terminal.

CAUTION

HIGH OIL PRESSURE WITHIN VALVE AND
CONTROLLER.
Removing the controller may cause
cylinder leakage. Brace and block the boom before
removing lift valve and telescope valve controllers.

MAP0630

6

2

4

5

3

1

Valve Controller

Valve

MAP0430

1

2