Figure 42, Following order as shown in – Kontron NSC2U IP Network Server User Manual

Page 60

Advertising
background image

NSC2U Server—Optional Component Installations

Kontron IP Network Server NSC2U

Product Guide, rev. 1.4

December 2009

60

5. Route the end of the GbE cables going to the front panel through the retention clip.

(

Figure 43

, “A”)

6. Leave the LED ribbon cable out of the retention clip.

Note:

Do not fully re-install the riser card assembly in the chassis yet. The connection to the

front panel must be set up first. Put the assembly in position without inserting the riser

cards into the server board slots.

Figure 42.

Configuring the LAN Card

TS000319

G

D

E

C

B

F

A

Figure 43.

Routing the GbE Cables through the Retention Clip