Figure 51 Network diagram

Configuration procedure

1.

Create VLANs, and assign corresponding ports to the VLANs, and configure the IP address of
each VLAN interface as shown in

Figure 51

. (Details not shown.)

2.

Configure an NQA test group on Switch A.
# Create an NQA test group with the administrator name admin and the operation tag test.

<SwitchA> system-view

[SwitchA] nqa entry admin test

# Configure the test type as ICMP-echo.

[SwitchA-nqa-admin-test] type icmp-echo

# Configure the destination address as 10.1.2.2.

[SwitchA-nqa-admin-test-icmp-echo] destination ip 10.1.2.2

# Set the test frequency to 100 milliseconds.

[SwitchA-nqa-admin-test-icmp-echo] frequency 100

# Configure reaction entry 1, specifying that five consecutive probe failures trigger the Track
module.

[SwitchA-nqa-admin-test-icmp-echo] reaction 1 checked-element probe-fail

threshold-type consecutive 5 action-type trigger-only

[SwitchA-nqa-admin-test-icmp-echo] quit

# Start the NQA test.

[SwitchA] nqa schedule admin test start-time now lifetime forever

3.

Configure a track entry on Switch A.
# Configure track entry 1, and associate it with reaction entry 1 of the NQA test group (with the
administrator admin, and the operation tag test).

[SwitchA] track 1 nqa entry admin test reaction 1

4.

Configure VRRP on Switch A.
# Create VRRP group 1, and configure the virtual IP address 10.1.1.10 for the group.

[SwitchA] interface vlan-interface 2

[SwitchA-Vlan-interface2] vrrp vrid 1 virtual-ip 10.1.1.10

# Set the priority of Switch A in VRRP group 1 to 110.