Network requirements, Configuration procedure – H3C Technologies H3C S12500 Series Switches User Manual

Page 233

Advertising
background image

222

round-trip min/avg/max = 1/1/2 ms

Static routing-Track-BFD collaboration configuration example

Network requirements

As shown in

Figure 55

, Switch A, Switch B, and Switch C are connected to two segments 20.1.1.0/24

and 30.1.1.0/24. Configure static routes on these routers so that the two segments can communicate with

each other, and configure route backup to improve reliability of the network.
Switch A is the default gateway of the hosts in segment 20.1.1.0/24. Two static routes to 30.1.1.0/24 exist

on Switch A, with the next hop being Switch B and Switch C, respectively. These two static routes back

up each other, where:

The static route with Switch B as the next hop has a higher priority, and is the master route. If this
route is available, Switch A forwards packets to 30.1.1.0/24 through Switch B.

The static route with Switch C as the next hop acts as the backup route.

Configure static routing-Track-BFD collaboration to determine whether the master route is available
in real time. If the master route is unavailable, BFD can quickly detect the route failure to make the

backup route take effect, and Switch A forwards packets to 30.1.1.0/24 through Switch C and
Switch B.

Similarly, Switch B is the default gateway of the hosts in segment 30.1.1.0/24. Two static routes to

20.1.1.0/24 exist on Switch B, with the next hop being Switch A and Switch C, respectively. These two

static routes back up each other, where:

The static route with Switch A as the next hop has a higher priority, and is the master route. If this
route is available, Switch B forwards packets to 20.1.1.0/24 through Switch A.

The static route with Switch C as the next hop acts as the backup route.

Configure static routing-Track-BFD collaboration to determine whether the master route is available
in real time. If the master route is unavailable, BFD can quickly detect the route failure to make the

backup route take effect, and Switch B forwards packets to 20.1.1.0/24 through Switch C and

Switch A.

Figure 55 Network diagram

Configuration procedure

1.

Create VLANs, and assign corresponding ports to the VLANs, and configure the IP address of

each VLAN interface as shown in

Figure 55

. (Details not shown.)

2.

Configure Switch A.

Advertising
This manual is related to the following products: