C2-20 – Yokogawa YFGW710 User Manual

Page 141

Advertising
background image

<C2. Field Wireless Configurator>

C2-20

IM 01W01F01-01EN

6. Before starting the download, you can test the connection to the YFGW710. Push [Test

Connection] button. A popup message will indicate whether the connection is successful or

not and, in the latter case, the reason for the connection failure.

7. Press [Start Download]. A popup window will appear and request your confirmation to start

the download and also inform you about the restart necessity. Click [OK] to continue, or

[Cancel] to abort the download.

8. When the download starts, the Download Progress window opens, displaying a real-time

download progress report. From this window you can:

• By clicking [Cancel], cancel the download operation after confirmation. When the

download is complete, the button is no longer displayed.

• Save the report to a file named by default based on the following format: ProjectName_

NetworkID_CurrentDate (mmddyy) (e.g. Project_1-36-021110.dl.log”)

Figure C 2-18

9. If you are working on a new project that you have not saved before the download, you will

be prompted to save it.

Advertising