A3.1.3 mounting procedure, A3.1.3, A3-3 – Yokogawa YFGW710 User Manual

Page 23: Ninstallation of explosion proof compliant device, Nmounting to 2-inch (2b) pipe with bracket, Important

Advertising
background image

<A3. YFGW710 Field Wireless Integrated Gateway>

A3-3

IM 01W01F01-01EN

l

Vibration and Impact

Although the device is designed to be resistant to vibration and impact, an installation site

should be selected where vibration and impact are kept to a minimum.

n

Installation of Explosion Proof Compliant Device

The explosion proof compliant equipment can be installed in the hazardous area of specific

gases. This device must be installed in accordance with the regulations of the country where the

device is installed.

• Installation: Check that the ambient temperature is not beyond the limit.
• Wiring: Put all the power cables in protective ducts. If possible, also put the network cables

(optical fiber cable or metal cable) in protective ducts.

• Maintenance: After confirming that there is no dangerous gas in the ambience, open the

housing or protective ducts.

A3.1.3 Mounting Procedure

Mount YFGW710 on the 2-inch (2B) pipe or the wall where the environment satisfies all the re-

quirements for the wireless device.

SEE

ALSO

For more information about the installation environment, see the General Specification of YFGW710 Field Wire-

less Integrated Gateway (GS 01W01F01-01EN).

n

Mounting to 2-inch (2B) Pipe with Bracket

When mounting the device on the 2-inch (2B) pipe, a dedicated bracket should be used. This

bracket is an option of YFGW710, see the model code list.

This bracket does not support the mounting to the horizontal piping.

Bracket

2-inch (2B) pipe

FA0302.ai

Fig. A 3-2 Mounting YFGW710 to 2-inch (2B) pipe

IMPORTANT

YFGW710 is a heavy device (5.1 kg). Ensure that the bracket and 2-inch (2B) pipes used for

mounting are fixed firmly enough to withstand strong wind and vibration. The device must be

maintained in its upright position.

Advertising