Steps at the primary site – HP XP P9500 Storage User Manual
Page 166
Advertising
Steps at the primary site
1.
From the primary host, define a path set consisting of inter-disk controller logical paths (Primary
→ Intermediate, Primary → Remote, and Intermediate → Remote) (or use Remote Web Console
to set up paths).
A path set definition file is created.
2.
From the primary host, create a route list (Primary
→ Intermediate → Remote) in the forward
direction.
3.
From the primary host, establish inter-disk controller logical paths (Primary
→ Intermediate,
and Primary
→ Remote).
166 Configuration definitions
Advertising