Failover – HP XP P9500 Storage User Manual

Page 451

Advertising
background image

Failover

To perform a failover:
1.

Use Business Continuity Manager to detect whether a HyperSwap has been executed by TPC-R
on the primary host.

2.

Check the statuses of copy groups.

YKQUERY

3.

On the primary host, execute the YKSUSPND FLUSH command for Cnt Ac-J Z copy pairs
between the primary storage system and the remote storage system.

When an I/O error or the SUSPER status (a failure suspension) occurs, you do not need to do
anything.

YKQUERY

YKSUSPND FLUSH

YKEWAIT GOTO(SUSPEND)

Using a 2DC configuration with HyperSwap and Continuous Access Journal Z

451

Advertising