Preparing the hardware (3dc, Multi-target (cnt ac-j z – HP XP P9500 Storage User Manual

Page 183

Advertising
background image

Figure 84 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration example

Preparing the hardware (3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration)

The following tables list the prerequisite hardware and storage system settings for using Business
Continuity Manager in a 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration.

Table 53 Prerequisite hardware (3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration)

Remarks

Description

Item

--

One host must be installed at each site.

Host

Only one storage system is allowed for each site.

One XP P9500 storage system must be installed
at each site (three storage systems are required
in total).

Storage system

Physical paths between the sites must always be
established.

Bidirectional physical path connected by a Fibre
Channel cable is required between the storage
systems at the following sites:

Link between storage
systems (physical
path)

Primary site and remote site 1

Primary site and remote site 2

Remote site 1 and remote site 2

Defining a 3DC Multi-Target (Cnt Ac-J Z x Cnt Ac-J Z) configuration 183

Advertising