Settings for operations at the primary site – HP XP P9500 Storage User Manual

Page 188

Advertising
background image

Settings for operations at the primary site

1.

From the primary host, define a path set consisting of inter-disk controller logical paths (primary
site

→ remote site 1, and primary site → remote site 2) (or use Remote Web Console to set

up paths).

2.

From the primary host, create a route list (primary site

→ remote site 1, and primary site →

remote site 2 routes).

3.

From the primary host, establish inter-disk controller logical paths (Primary

→ Remote 1, and

Primary

→ Remote 2).

188 Configuration definitions

Advertising