Preparing, Operating procedure, During a – HP XP P9500 Storage User Manual

Page 352

Advertising
background image

YKQUERY

YKRESYNC FORWARD

YKEWAIT GOTO(DUPLEX)

4.

Execute the YKEWAIT GOTO(SUSPEND) command and wait until the status of the Continuous
Access Journal Z copy pair between the intermediate site and the remote site has changed to
SUSPOP

.

5.

Resume operation at the primary site.

6.

From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
copy pair between the intermediate site and the remote site.

YKQUERY

YKRESYNC

YKEWAIT GOTO(DUPLEX)

Operation returns to normal.

Operating procedure during a path failure between the storage systems at the primary
site and the intermediate site

The following are operating procedures that must be performed when a path failure occurs between
the storage systems at the primary site and the intermediate site.

Preparing

For details about the preparing procedure required when a path failure occurs between the storage
systems at the primary site and the intermediate site, see the preparatory procedure used when a
nonvolatile failure occurs in the intermediate site storage system. For details, see

“Preparing”

(page 345)

in

“Operating procedure during an intermediate site storage system failure (nonvolatile)”

(page 345)

.

352 Maintenance and troubleshooting operations

Advertising