Steps at the intermediate site – HP XP P9500 Storage User Manual

Page 168

Advertising
background image

Steps at the intermediate site

1.

From the intermediate host, define a path set consisting of inter-disk controller logical paths
(Intermediate

→ Primary) (or use Remote Web Console to set up paths).

2.

From the intermediate host, create a route list (Intermediate

→ Primary, and Intermediate →

Remote routes).

3.

From the intermediate host, establish inter-disk controller logical paths (Intermediate

→ Primary).

168 Configuration definitions

Advertising