Operating procedure during a path failure, Between the primary, Site storage system – HP XP P9500 Storage User Manual

Page 512: And the intermediate

Advertising
background image

6.

Execute the YKEWAIT GOTO(SUSPEND) command, and wait until the status of the Continuous
Access Journal Z copy pair has changed to SUSPOP.

7.

From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
EXCTG.

YKQUERY

YKRESYNC

YKEWAIT GOTO(DUPLEX)

Operation is returned to normal.

Operating Procedure During a Path Failure between the Primary Site Storage System
and the Intermediate Site Storage System

The following are the procedures to be performed when a path failure occurs between the primary
site storage system and the intermediate site storage system.

512

Maintenance and troubleshooting operations

Advertising