Operating procedure during an intermediate, Site storage system – HP XP P9500 Storage User Manual

Page 497

Advertising
background image

7.

Execute the YKEWAIT GOTO(SUSPEND) command, and wait until the status of the Continuous
Access Journal Z copy pair has changed to SUSPOP.

8.

From the primary site, execute the YKRESYNC command for the Continuous Access Journal Z
EXCTG.

YKQUERY

YKRESYNC

YKEWAIT GOTO(DUPLEX)

Operation is returned to normal.

Operating Procedure During an Intermediate Site Storage System Failure (Volatile)

The following are the procedures to be performed when the intermediate site storage system is in
a volatile failure state.

Using a 4x4x4 Cascade Configuration 497

Advertising