Settings for operations at remote site 2 – HP XP P9500 Storage User Manual

Page 190

Advertising
background image

3.

From remote host 1, establish inter-disk controller logical paths (Remote 1

→ Primary, and

Remote 1

→ Remote 2).

4.

From remote host 1, register a command device for the storage systems at remote site 1,
primary site, and remote site 2.

Settings for operations at remote site 2

1.

From remote host 2, create a path set consisting of inter-disk controller logical paths (Remote
2

→ Primary, and Remote 2 → Remote 1) (or use Remote Web Console to set up paths).

190 Configuration definitions

Advertising