Pre-assembly inspections, Replacement guidelines – Goulds Pumps 3196 i-FRAME - IOM User Manual
Page 88
Maintenance
Pre-assembly inspections
Guidelines
Before you assemble the pump parts, make sure you follow these guidelines:
• Inspect the pump parts according to the information in these pre-assembly topics before
you reassemble your pump. Replace any part that does not meet the required criteria.
• Make sure that the parts are clean. Clean the pump parts in solvent in order to remove oil,
grease, and dirt.
NOTICE:Protect machined surfaces while you clean the parts. Failure to do so may result
in equipment damage.
Replacement guidelines
Casing check and replacement
Inspect the casing for cracks and excessive wear or pitting. Thoroughly clean gasket surfaces
and alignment fits in order to remove rust and debris.
Repair or replace the casing if you notice any of these conditions:
• Localized wear or grooving that is greater than 1/8 in. (3.2 mm) deep
• Pitting that is greater than 1/8 in. (3.2 mm) deep
• Irregularities in the casing-gasket seat surface
Casing areas to inspect
The arrows point to the areas to inspect for wear on the casing:
Figure 18: 3196, HT 3196, LF 3196, NM 3196, and 3198 casing
Impeller replacement
This table shows the criteria for replacing the impeller:
Impeller parts
When to replace
Impeller vanes
• When grooved deeper than 1/16 in. (1.6 mm),
or
• When worn evenly more than 1/32 in. (0.8 mm)
Pumpout vanes
When worn or bent more than 1/32 in. (0.8 mm)
Vane edges
When you see cracks, pitting, or corrosion damage
86
Model 3196 i-FRAME Installation, Operation, and Maintenance Manual