Mains connection: fuses and cable cross-sections, Mains connection: fuses and cable cross−sections, Electrical installation – Lenze 9300 0.37kW-75kW User Manual

Page 185

Advertising
background image

Electrical installation

Standard devices in the power range 55 ... 75 kW

Mains connection: Fuses and cable cross−sections

5

l

185

EDKVS9332X DE/EN/FR 6.1

PE

+UG

-UG

L1

L2

L3

3

0

1

2

L1, L2, L3
+U , -U
PE

G

G

M10
30 Nm
264 lb-in

}

+

PE

9300vec127

Fig. 5−20

Mains connection, DC supply for 55 ... 75 kW drive controller

0 PE stud

Connect PE cable with ring cable lug

1 Conductive surface

2 Shield clamp

Place shield with large surface on control cabinet mounting plate and fasten with shield
clamp (shield clamp is not part of the scope of supply)
To improve the shield connection, also place the shield on the PE stud

3 Mains and DC bus connection

L1, L2, L3: Connection of mains cable with ring cable lugs
+U

G

, −U

G

: Connection of DC−bus components or connection of the controller in the DC−bus

system (see system manual)

5.7.3

Mains connection: Fuses and cable cross−sections

Installation in accordance with EN 60204−1

Supply conditions

Range

Description

Fuses

l

Utilisation category: only gG/gL or gRL

Cables

Laying systems B2 and C: Use of PVC−insulated copper cables, conductor temperature < 70 °C,
ambient temperature < 40 °C, no bundling of the cables or cores, three loaded cores. The data are
recommendations. Other dimensionings/laying systems are possible (e.g. in accordance with
VDE 0298−4).

RCCB

l

Controllers can cause a DC current in the PE conductor. If a residual current device (RCD) or a
fault current monitoring unit (RCM) is used for protection in the case of direct or indirect
contact, only one RCD/RCM of the following type can be used on the current supply side:
– Type B (universal−current sensitive) for connection to a three−phase system
– Type A (pulse−current sensitive) or type B (universal−current sensitive) for connection to a

1−phase system

Alternatively another protective measure can be used, like for instance isolation from the
environment by means of double or reinforced insulation, or isolation from the supply system
by using a transformer.

l

Earth−leakage circuit breakers must only be installed between mains supply and controller.

Observe all national and regional regulations!

Advertising