Final works

Installation check

6

l

210

EDKVS9332X DE/EN/FR 6.1

6

Final works

6.1

Installation check

(

Stop!

Destruction of the digital outputs (X5/A1 … X5/A4).
The digital outputs are not protected against external voltage.
Possible consequences:

ƒ

Applying an external voltage to X5/A1 … X5/A4 can damage the digital
outputs. The control card does not work correctly any longer.

Protective measures:

ƒ

Never apply an external voltage to the terminals X5/A1 … X5/A4.

After completing the installation, the following must be checked:

ƒ

Wiring for completeness, short−circuit, and earth fault

ƒ

Supply of the internal fan (only 500 V types)
– the bridge position depends on the mains voltage applied

ƒ

Power connection:
– Supply via terminals L1, L2 and L3 (direct mains connection)

ƒ

Motor connection in correct phase relation (direction of rotation)

ƒ

Incremental encoder (direction of rotation), if any

)

Note!

The installation check is followed by commissioning. Further information can
be obtained from the System Manual for the drive controller.

ƒ

Read the System Manual carefully before you switch on the controller!

ƒ

Carry out the commissioning steps in accordance with the System Manual!

ƒ

If you use the "safe standstill" function, check the function of the circuit!