Quick commissioning – Lenze EDK71MMXXX−010 User Manual

Page 69

Advertising
background image

Quick commissioning

1

,

Read safety instructions

^ 71

2

start033

Assemble starttec

^ 81

3

Establish minimum wiring

^ 84

start030

BN

GND

L1
L3

N

3/N/PE AC 100 … 550 V

45 … 65 Hz

L2

+

-

20 28

E1

7

E2 E3 E4 E5

A1 A2 A3 A4

A+ A-

7 59 59

X3

T1 T2

X3

X3

B1 B2

2W

2V

2U

1W

1V

1U

PE

+24 V DC

(+18 VDC - 0 % … +30 VDC + 0 %,

200 mA ... 1.5 A)

7

20

7 7

20

L1 L2 L3

M

3~

X1

X1

X1

4

1.4 A

1.8 A

2.4

A

3.0 A

4.0

A

5.5 A

7.0 A

9.5

A

OFF

1.0

A

0 1 2

3

45

67

8

9

start032

Set the rated motor current with stepping switch for I

2

t monitoring

(

Position 0" (OFF) = no I

2

t monitoring

^ 96

5

2.4 Nm

21 lb-in

IP65

}

start019

Close starttec

^ 98

6

7. Ensure that terminal X3/28 = LOW
8. Switch in mains voltage
9. Switch on 24−VDC supply

^ 97

7

X3/28

X3/E1

X3/E3

start035

Start the drive

1. Release starttec:

– X3/28 = HIGH

2. Release brake, if necessary:

– X3/E3 = HIGH

3. Start motor 1

– X3/E1 = HIGH

?

?

Faults during commissioning or during operation?

^ 128

Advertising