3 quick start installation of the 9135/9140 switch – CANOGA PERKINS 9140 Four-Port SNMP Managed Fast Ethernet Switch User Manual
Page 14

1-4
1.3
Quick Start Installation of the 9135/9140 Switch
The initial setup of your EdgeAccess 9135 Two-Port or 9140 Four-Port Switch (9135/9140) involves four
stages:
•
Selecting the location for the 9135 or 9140 Switch
•
Configuring the interface modules
•
Connections for a selected application
•
Management connection and operation
Step 1 Unpack the Switch and determine the best method of installation for your unit; stand alone, rack
mount, or wall mount. Refer to chapter 4 for detailed unpacking instructions and mounting
considerations.
Step 2 With the 9135 or 9140 securely in place, plug the supplied power cord, female end, into the power
entry module on the rear of the unit (see Figure 1-3). Plug the male end of the cord into an AC
outlet. Turn on the power switch located on the power entry module.
Figure 1-3. Power Entry Module and Switch
.
Power Entry Module with
AC Power Switch
Formatted: Bullets and Numbering
Deleted: 1.3